Lin frequency engineer summarizes several important maintenance methods for high and low temperature test chambers
Protect it from external damage. Based on years of work experience, Lin frequency engineers have summarized several important maintenance methods for high and low temperature test chambers, so that the equipment can last longer.
1. Cleaning of the test area: The dirt and foreign matter in the test area can affect the test results, so it is necessary to clean the test area before each test.
2. Detection of leakage protector: In order to ensure the normal operation of the circuit breaker and the leakage switch, please check it once a month, check the method. When pushing the circuit breaker, click the test button. If the circuit breaker jumps, the protection action Normal, otherwise it is not normal, please repair or contact our after-sales service department as soon as possible.
3. Cleaning of the power distribution cabinet: Dust accumulation in the power distribution cabinet will cause unnecessary failure. The first step is to turn off the power switch, then open the power distribution cabinet, using a vacuum cleaner or a compressed air spray gun (must be dry and clean compressed air) Remove the dust from the power distribution cabinet and follow the cleaning sequence from top to bottom.
The length and maintenance of the high and low temperature test chambers are closely related. Most of the above forest frequency engineers have summarized the equipment cleanly, so it is especially important to clean the equipment every time the test is done. The natural equipment is just like the factory. The same, so the life expectancy doubled.
Jiangmen Lihua Import & Export Trading Co., Ltd. Jiangmen Lihua Furniture., Ltd. , https://www.jmlihua.com